COFRASTRA 56 PDF

Previously shown as 16DEC The aircraft is to be used for aerial survey and is fitted with 1 seat in the cockpit and 4 seats in the cabin. CofR No. In addition to the crew, three passengers were carried. Source: 1 24JUN57 At hours, the aircraft departed Horn Island with only the normal crew on board to conduct aerial photography over the northern portion of the Cape York Peninsula.

Author:JoJot Goltihn
Country:Bahamas
Language:English (Spanish)
Genre:Health and Food
Published (Last):24 February 2019
Pages:35
PDF File Size:16.38 Mb
ePub File Size:16.3 Mb
ISBN:890-2-76454-860-1
Downloads:32893
Price:Free* [*Free Regsitration Required]
Uploader:Momi



Penny later repossessed A and gave it to the Shell Company as a guarantee against his fuel bills. Curtis Madsen Aircraft Pty. Major overhaul, including fitment of overhauled engines and propellers to be completed by Curtis Madsen at Bankstown, but EWA wish to complete the following themselves at Tamworth owing to the unavailability of manpower at Sydney and the desire to complete the conversion in a much shorter period: Flooring to approved drawing.

Fitting of approved seats to floor. Cold air duct. Toilet compartment to approved drawing. Bomb-door access door re-work to approved drawing. Interior soundproofing and lining. We propose using a standard Hudson window and require it on starboard side only. We would like your opinion on the matter before submitting proper drawings. Baggage door on port bomb bay door, to approved drawing. Toilet compartment to approved drawing including wash basin and water tank.

Cold air ventilating system to approved drawing. Rework of existing heating system to approved drawing. Sound-proofing consisting of 2 layers of "Tropal" between lining of cabin, pilots door and toilet door bulkhead. Curtains to be fabric of a fire resisting quality or treated to resist fire. Fitting of additional window between stations and starboard side to approved drawing. Completion of escape hatch in cabin roof to approved drawing.

Fitting of sixteen passenger seats manufactured to approved drawing.

ATTI IMPURI PASOLINI TESTO PDF

Dokumentendownload

Kagagal Product selector The lack of an open cavity optimises safety on site Well organised building sites Several storeys of floor can be prepared in advance. A successful project that counted with the collaboration of our experts from different business divisions in order to achieve the best results: Home Cofrastea selector Floors. Allows completed floors to be put into use earlier whilst allowing ongoing development of other levels. Suspended ceilings and technical equipment can be easily installed thanks to the Cofrafix clip systemwhich can be introduced manually into the steel profile ribs avoiding noisy drilling. The composite effect with the steel profiles is achieved thanks to its undercut shape and the open ribs. Composite floors The wide range of Arval floors makes it possible to adapt to all site conditions and the technical needs of the client. Case study Rolex Learning Center: Open-rib composite floor decks.

HENRI LABORIT ELOGIO DELLA FUGA PDF

.

EL SILENCIO DEL FINAL DANIEL RABINOVICH PDF

.

ALOTROPOS DEL CARBONO PDF

.

Related Articles